E-Pao! Education - Tipaimukh Dam Is A Geotectonic Blunder Of International Dimensions?

Tipaimukh Dam Is A Geotectonic Blunder Of International Dimensions?
- Part 2 -

By: Dr. Debabrata Roy Laifungbam / Dr. Soibam Ibotombi *



Tipaimukh Dam/Cachar Plain Irrigation Project: A Complicated International Disaster
Scenario for Bangladesh


The scenario and consequences of a Tipaimukh Dam-break has not been thoroughly studied. NEEPCO has yet to complete a basic scientifically sound environment impact assessment even though it is geared up to start construction after having opened international bidding for Engineering, Procurement and Construction (EPC). Such a study has to be conducted by international as well as national dam-safety experts as the impacts of a dam-break will have both severe upstream and downstream effects.

However, the downstream effects of a Tipaimukh Dam-break have been studied by the Government of Bangladesh since 1992-94. In its Flood Action Plan 6 (FAP 6) as part of the North Eastern Regional Water Management Plan of Bangladesh, the scenario of a dam failure at Tipaimukh Dam project was investigated by international hydraulic and environmental experts in the context of a comprehensive flood action plan for Sylhet District.

India is also planning a major Cachar Plain Irrigation Project downstream of the dam. Bangladesh already knew a fact that we in Manipur do not know still. Surprisingly, for the people of Manipur, the Tipaimukh project is not the only project at the drawing board on the Barak River. This means that water released from the dam reservoir will be further diverted for the irrigation project planned in Cachar District, contrary to NEEPCO's recent claims.

FAP 6 had a Future Without Plan (FWO) component that looks at a dam-break scenario with minimally adequate project description available through the Joint Rivers Commission (Indo-Bangladesh). Bangladesh has pending issues with the Government of India with regard to the dam that includes the effects of flow regulation. Regulation of the Barak's flow by Tipaimukh Dam would provide India with the opportunity to irrigate the Cachar Plain; this India proposes to do.

Since the Cachar Plain Irrigation plan involves the loss of water, it is a matter of great concern to Bangladesh particularly its North Eastern Region as no statement is available how much water Indian intends to take from this scheme. For the purposes of the FAP 6 study it was assumed that the total depth of irrigation water to be applied is 1 M and that the water is diverted on a continuous basis during the six dry months (November through April).

A dam-break scenario must be studied by dam safety specialists. It is very doubtful whether NEEPCO or any other agency has conducted such a study. According to the Bangladesh study, the risk that the Tipaimukh Dam poses for Bangladesh is extremely significant for the Meghna River system (including the Surma and Kushiyara Rivers of Sylhet).

The study recognises that the region is known to be vulnerable to earthquakes. These events, though relatively rare are extreme in intensity, and can reverse existing morphologic trends and even induce re-configuration of the drainage system.

The likelihood that during 1991-2015 the region would experience an earthquake of magnitude 7.6 (similar to the 8 July 1918 event with its epicenter at Srimangal of magnitude 7.6, return period of 30 to 50 years) is between 40 and 60%; of magnitude 8.7 (similar to the 12 June 1897 event with its epicenter at the Shillong Plateau with magnitude 8.7, the largest on record, return period of 300 to 1000 years) is perhaps 2 to 5%, assuming the events are random and can be described with a simple binomial probability model.

On past evidence, river channels and sedimentation patterns in the Northeast Region may be subject to major disruptions following a severe seismic event. During past earthquakes, instances of ground liquefaction, landsliding, rapid subsidence, collapse of river banks, and changes to river courses have been documented (District Gazetteer, 1917). The effects of earthquakes along the Brahmaputra River were described in 1899:

"Strong ground shaking triggers liquefaction of river cross-sections in a few seconds; underwater slopes slide towards the stream axis, the bottom of the river heaves, and the banks become lowered; water immediately starts to rise and overflows the banks and adjacent zones where infilling of the channels takes place. Natural sills form, causing temporary lakes to develop; channels gradually re-open by scouring where currents are strong enough, and consequently water levels decrease.

Where channels remain blocked, streams desert their old channels to form new ones; and in subsequent years, the huge amounts of sediment poured into the river as a result of the earthquake gradually moves downstream. Sediment transport is higher than previously and siltation conditions are therefore modified.

Earthquakes are believed to have also induced landsliding and slope failures in headwater catchments in the Shillong Plateau, which could greatly increase the amount of sediment supplied to the region for long periods of time. Joglekar (1971) described apparent impacts of major earthquakes on the upper Brahmaputra in Assam, India. After the severe earthquakes of 1947 and 1950, the bed level near Dibrugarh rose substantially. Between 1947 and 1951, low water levels rose by as much as three to four metres; thereafter they were steady.

Dam Failure

This risk is however a significant issue relating to future environmental management of the Northeast Region water system of Bangladesh.

A dambreak is a catastrophic failure of a dam which results in the sudden draining of the reservoir and a severe flood wave that causes destruction and in many cases death downstream. While such failures are rare and are not planned they have happened to dams, large and small, from time to time. The International Commission on Large Dams (ICOLD) has identified 164 major dam failures in the period from 1900 to 1965.

With respect to the safety of the proposed Tipaimukh Dam, hydraulic and environmental specialists opine that well-designed and constructed rockfill dams are perhaps the safest type for large heights (Tipaimukh would be among the largest of such dams in the world), but local circumstances may be much more important in this respect than dam type.

Two examples illustrate the types of failures that have been reported. The most famous, the Teton Dam in the United States was a 90 m high earth-fill dam which failed in 1.25 hours. The flood wave which was released had a peak discharge of 65,000 m3 s-1 at the dam and a height of 20 m high in the downstream canyon. The Huaccoto Dam in Peru was 170 m high, similar to the Tipaimukh Dam; it failed over 48 hours due to a natural landslide in the reservoir.

Generally, a flood wave travels downstream at a rate in the order of 10 km hr-1 although velocities as high as 30 km hr-1 have been reported near failure sites. From these wave velocities, it would appear that the initial flood wave could travel the 200 km distance from Tipaimukh Dam site to the eastern limit of Bangladesh within 24 hours having a height of perhaps 5 m. Peak flooding would occur some 24 to 48 hours later. High inflows would persist for ten days or longer and the flooded area would likely take several weeks to drain.

The Tipaimukh reservoir is huge (15,000 Mm3) compared with experience reported in the literature. In the event of a significant unplanned discharge, the river system in Bangladesh would respond (drain) rather slowly, as characterized by the outflow rate relative to the floodplain storage volume), such that most of the water released would remain ponded over the Northeast Region for some time. Assuming a release volume of 10 Mm3 and a ponded area of 100 km2, the depth of flooding would be an average of 1.0 m above the normal flood level.

There will be first an imperative need for Bangladesh and India to cooperate in formulating and implementing risk management measures if the Tipaimukh Dam as presently designed should be constructed. A wide range of risk management measures are normally undertaken, including: regular inspections by independent engineering teams, instrumentation and plans for warning downstream populations of deteriorating conditions of a dam, evacuation plans, and so on. As and when India's plans proceed, there will be a clear need for Bangladesh to avail itself of expert technical assistance from dam safety specialists experienced with very large dam/reservoir systems and trans-border risk management.

For illustrative purposes only, the Bangladesh study modeled flood waves for a test case of an instantaneous failure, 50 m wide extending to 100 m below the crest of the dam. Discharge and water level hydrographs were presented for three locations: at the exit from the mountain valley (km 80), at Silchar (in the middle of the Cachar plain, km 140) and at Amalshid (km 200).

It was forecast that substantial attenuation of the flood wave would occur upstream of Amalshid and that the flood wave at Amalshid would be a long-duration event. Depending on the breech geometry and peak discharge, the flood peak would occur at Amalshid approximately 2 to 3 days after the dam break had occurred and flooding would continue for ten days or more. The flood levels at Amalshid would rise to approximately 25 m PWD (peak water discharge), which is at approximately 8 m above the floodplain level. This flood level depends on the boundary assumptions made and could vary depending on floodplain conveyance.

Socio-Economic Aspects: "An Electric Bulb from every Tree"

As per the technical report of the NEEPCO (1998), the dam will have a firm generation of 401.25MW only implying that 401.25MW of power only will be generated regularly, and this is the best scenario. And again as per the past Central Government formula, the Government of Manipur (GOM) will get only 12% of 401.25 i.e. 40-43MW free (sharing with Mizoram where 90% is claimed by Manipur state but this is subject to Government of India set norms which has changed from time to time; it has been revised since).

In order to get this 40-43MW of power, the State will be loosing around 293.56Km2 under submergence of reservoir water which includes 4760ha of gardens, 2053ha of rice cultivable land, 178.21Km2 of total 7251.36Km2 of forest land beside affecting a numbers of villages (15+90). Let us introspect as well as retrospect the case of Tipaimukh dam in comparison with the Loktak Hydro Electric Project and analyze the possible implications in the next 50 years hence especially for the natural resources that will be deprived of the state.

When Loktak project was initiated in the late 1960's - the tall claims made by the authority/government were: thousands of hectares of cultivable land will be generated by draining water of Loktak lake to Leimatak river, price of 1 unit of power will be only 5 paise, the installed capacity of 105MW is 10 times more than the power what the State requires and there will be no power problem for the next 50 years or so, etc.

Now it is over 20 years of commissioning of the project - thousands of cultivable land have been submerged under the lake (reservoir) water contrary to what they claimed, 50-70 paise was price of 1 unit of power at the time of commission, power supply is at its worst nowadays and likely to worsen, which every citizen knows; and rehabilitation and compensation issues are yet to be settled at the Gauhati High Court.

And besides, a range of grave environmental and ecological problems especially of the Loktak Lake threatens this internationally important wetland's very existence along with the Keibul Lamjao National Park, with ecological damage to the entire Imphal Valley and the catchment areas. The State gets about 6-10MW of free power intermittently from the Loktak Hydro Project. The question is whether it is sufficient to compensate the economic, natural resources and environmental loss which the State bears presently?

Now let us examine the possible implications of the Tipaimukh project in a similar manner. As pointed out above, the 293.56Km2 of submerged area consists of 5760ha and 2053ha of garden and cultivable lands respectively. These figures, the author believes, are far underestimated because at present, less than 50% of arable and cultivable lands in the Barak river beds are utilized due to thin population of the region, which will be possibly utilized in the next 50 years due to population increase. So approximately a total of about 15,626ha (11520ha + 4106ha) of cultivable land will be lost.

Again, although 178.21Km2 of the total forest area will be permanently submerged under water, practically the natural resources of a much larger forest area will be unavailable permanently to the State. Net Present Value levy for forest land conversion to non-forestry use as per the Supreme Court directives would also make the project economically unviable, as claimed by NEEPCO on 28t January 2006 (Tipaimukh Multipurpose project tariff increases by 67 paisa/unit on this account of NPV) in its submission to the Supreme Court's Expert Committee.

Compensatory Afforestation Programmes (CAP) will take over large tracts of other categories of forested lands besides Reserve Forests as well, but most of these programmes will never be implemented. After completion of the project, the project authority will claim that depletion of forest and other natural resources in the nearby catchment area will increase siltation in the reservoir leading to the reduction in storage capacity of the reservoir. This, in turn, will reduce the generation capability of the power plant and so on.

The same was true in the case Loktak project where the lake water level is to be maintained as a reservoir in order to generate electricity, submerging thousands of cultivable land contrary to what the authority claimed in the beginning. So the question that can be raised is whether it will be a wise policy, in the long run, to surrender such a huge natural resources just for 40-43MW of free power. This is a huge question, no doubt, to ponder upon.

Discussion and Conclusion

Structural and tectonic setting, plate kinematics and interaction as well as seismic potential of Manipur state and the serious implications for the entire region's existing geomorphologic trends and even induce re-configuration of the drainage system amount to scientific and technical objections to the construction of a huge dam of the magnitude proposed in case of the Tipaimukh dam. Because, such a outmoded design dam may have the potential risk of a great disaster, killing hundreds and thousands of lives, and causing generational incalculable losses to future economic options, livelihoods and cultures.

So, the government must rethink about the construction of such a huge dam. Instead, it is advisable to construct relatively smaller projects with improved modern designs in order to scale down the magnitude of possible disaster since earthquake prediction and prevention is beyond human capability. It would be wiser and economically more sustainable to consider smaller dams or Run-of-the-River (RoR) schemes with an objective to reduce human induced disaster, and save the river.

Construction of smaller projects not only will tone down the magnitude of the possible human induced disaster but also will provide balanced sustainable development avenues for various regions of the State as well as minimize the environmental and ecological instability. In the meantime, Government of Manipur also should reassess all the power projects especially in terms of its operational efficiency and potentiality instead of simply waiting for a mere 40-43MW free power from Tipaimukh project which could last as long as 20-25 years.

For instance, the expected maximum head (difference between reservoir water level and power generation unit) is about 160m in the case of Tipaimukh project while in the case of Loktak Lake the head is about 269m which is approximately 100m more than that of the proposed Tipaimukh project. But such a tremendous head is wasted just to generate a variable 40-80MW of power only. This is nothing but sheer wasting of huge natural resources by severely underutilizing the immense potential. So, the potential of the installed Loktak project should be fully harnessed by Manipur after reassessing and renovating with an objective of enhancing its efficacy and benefit to the State while the project exists.

In conclusion, let us not waste and surrender our huge natural resources just for 40-43MW of power, and let us introspect, learn through mistakes of the past and rectify ourselves than repeating it. Because a wrong decision of ours will cost heavily on our future generation who will, otherwise, never forgive us. Let us remember popular Native American proverb which says, "The frog does not drink up the pond in which he lives."


Dr. Debabrata Roy Laifungbam is the Director, CORE, Manipur. Dr. Soibam Ibotombi is from the Dept. of Earth Sciences, Manipur University. This is their first contribution to e-pao.net . You can contact CORE (Centre for Organisation Research & Education) at http://www.coremanipur.org/


* Comments posted by users in this discussion thread and other parts of this site are opinions of the individuals posting them (whose user ID is displayed alongside) and not the views of e-pao.net. We strongly recommend that users exercise responsibility, sensitivity and caution over language while writing your opinions which will be seen and read by other users. Please read a complete Guideline on using comments on this website.




LATEST IN E-PAO.NET
  • The Happiness Code : Download
  • Violence in Manipur 2023-2024 : Timeline
  • NH-2 Bridge bombed @Sapermeina : Gallery
  • Crop/animal for higher productivity in NE #1
  • Training Programme under SPARK concluded
  • Why environment control is so difficult
  • 4th Foundation Day- Young Minds Collective
  • All set for second phase poll
  • The Nongsaba phenomenon
  • Khongjom Day @Khebaching #1 : Gallery
  • India's responsibility to end Manipur violence
  • Migrant worker could access TB services only
  • Importance of reading magazines as student
  • SHG pioneering agricultural innovation
  • Nearing the one year mark
  • The enemy within
  • Id-ul-Fitr @Hatta #2 : Gallery
  • Workshop @ NSU Manipur : Gallery
  • 15th Manipur State Film Awards 2023
  • "ST status for Meetei" at Panthoibi Shanglen
  • GSDP doubles, health shines
  • Vote has been cast, repoll held
  • Two faces of democracy
  • Laurels for Scientist Ngangkham Nimai
  • Crime against women in Manipur
  • "ST status for Meetei" at Sugnu
  • Creativity & innovation for vibrant career
  • 4th Foundation Day of YMC
  • Racing towards one year mark
  • Prophetic words, indeed
  • Nupi Landa Thaunaphabishing #14 :: Book
  • 174th Anniv Maharaj Narasingh #1 : Gallery
  • Ensuring Fair Voting in Hills of Manipur
  • Dr Irengbam Mohendra's latest book :: Rvw
  • NDA has the advantage in both
  • Lok Sabha polls in Manipur #1 : Gallery
  • L Rup's Robot 'Kangleinganbi' in Manipuri
  • Art- means of connecting hearts in Manipur
  • Is it Living Alive or Living Death ? :: Poem
  • Rabies - A preventable zoonotic disease
  • April 19, 2024: The blackest day of all
  • Ugly turns on voting day
  • Children Camp @JNMDA Imphal #2 : Gallery
  • The chasm between TB & HIV continues
  • Parliament and its Members
  • Kimchi for health and glowing skin
  • LS election with a difference
  • To vote, or not to vote ?
  • Sajibu Cheiraoba Chak Katpa #2 : Gallery
  • "ST status for Meetei" at Lamjao, Kakching
  • The Power of Poppy - 27 :: Poem
  • Mother Language based education essential
  • Modi's warriors wear regional hats
  • Nest Asia promoting Northeastern Cuisine
  • Now look beyond LS poll
  • The rot in the system
  • Scientists of Manipur : Laitonjam Warjeet
  • Community seed bank @Umathel : Gallery
  • 10 candidates cracked Civil Services Exam
  • Milk of Paradise: History of Opium : Rvw
  • How plastics find their way into our bodies
  • Condemning attack on Trucks along NH-37
  • Cong looking to buck the trend
  • Saving Manipur
  • Sajibu Cheiraoba: 1 occasion, 2 narratives #2
  • Election Duty :: Travellog
  • 1st Nagas' Meet in Punjab
  • How to select right MP to represent Manipur
  • "ST status for Meetei" at Tejpur
  • Bats are Keystone species for the Planet
  • The '15 days' conundrum
  • Free but not so fair
  • Descent of Radha-Krishna #30: Download
  • Before You Vote : My Rumbling Thoughts
  • "ST status for Meetei" at Kakching
  • Meiraba wins All India Sr tournament
  • Finding light in dark through my daughter
  • Navigating life's unreasonable expectations
  • Test of people's character
  • BJP's election manifesto
  • Athoubasingi Numit #1 : Gallery
  • Black rice & Glycemic Index
  • What Nadda should speak at Dimapur rally
  • Open Letter to CM Office Manipur
  • Meghalaya unveils Strawberry festival
  • Benefits of maths newspapers for students
  • Id-ul-Fitr @Hatta #1 : Gallery
  • Are you a good person ?
  • Physics Academy of NE : Executive Body
  • "ST status for Meetei" at Moirang
  • Cherrapunji Eastern Craft Gin launched
  • Cong on cautious path
  • Botox for Hair
  • Posers voters should raise now
  • The lull before the storm
  • 80th Anniv- Battle of Kanglatongbi @UK
  • Vir Chakra Ngangom Joydutta's bust unveiled
  • Hun - Thadou Cultural Festival : Gallery
  • "ST status for Meetei" at Singjamei
  • Election Eclipses: Ballad of Battle & Loss
  • Our voices are equal at the ballot box
  • Scientists of Manipur : Ngangkham Nimai
  • Urgent Call for Solidarity in Manipur
  • Meitei Nongsha #2 :: An Artwork
  • "ST status for Meetei" at Waikhong
  • About NPF-BJP-NPP alliance & why ?
  • World Veterinary Day, 2024
  • The heavy stake behind the LS polls
  • The politics of lying & deception
  • Sajibu Cheiraoba Chak Katpa #1 : Gallery
  • Hun-Thadou Cultural Fest @ Delhi: Report
  • Appeal to Parties & Candidates
  • "ST status for Meetei" at Wangoo
  • Establishment of community seed bank
  • Awareness Programme on new Criminal Laws
  • Make a right choice at the Lok Sabha election
  • Sajibu Cheiraoba: 1 occasion, 2 narratives #1
  • RIST talk-58 : Support systems of elderly
  • "ST status for Meetei" at Hiyanglam
  • Vote, do not boycott !
  • Lok Sabha election: A new dawn in politics ?
  • IIT-Guwahati Half Marathon report
  • Taking ST demand to the election ring
  • Lesson to be learnt from across border
  • Mirabai: Poised for Paris Olympics
  • Legal position for protection of environment
  • "ST status for Meetei" at Keisamthong
  • Heterocyclic compound & biochemical science
  • Inner, torn between two lovers
  • Certification Music Therapy Workshop
  • NOTA as a choice
  • Caesar's wife must be above suspicion
  • Descent of Radha-Krishna #29: Download
  • World Health Day 2024
  • "ST status for Meetei" at Pangantabi
  • The Power of Poppy - 26 :: Poem
  • Fulbright Fellowship Outreach at Arunachal
  • Id-ul Fitr da namaz nattana..
  • Nupi Landa Thaunaphabishing #13 :: Book
  • Lok Sabha election is coming, be prepared
  • 6th Hun-Thadou Cultural Festival
  • Let There Be Free & Fair Election
  • "ST status for Meetei" at Lamlong
  • Science magazines are important for student
  • Interesting choice of candidates
  • The power of We, the voters
  • Inspirations from Scientists of Manipur #1
  • The Case for Amendment of Article 371-C
  • Meitei Nongsha #1 :: Artwork
  • Link between forest & conflict in Manipur
  • Final Call for Application MFA - Phase-2
  • ST for Meiteis call before elections
  • Passing the buck
  • Beating of the Retreat #1 : Gallery
  • Life of our Lives in Ethnic Strife Era! :: Poem
  • IIT-Guwahati annual Half Marathon
  • Follow up: European Parliament on Manipur
  • Yoga & Kegel exercise: Pelvic floor workout
  • Opting for the NOTA button
  • Yearning of the displaced people
  • Kenedy Khuman (Singer) : Gallery
  • 5th NE Women's Peace Congregation
  • World Autism Awareness Day 2024
  • Election fever grips Manipur despite unrest
  • Looking for a decent election hustings
  • Clock ticking towards voting day
  • An exemplary directive
  • Children Camp @JNMDA Imphal #1 : Gallery
  • Memo to Election Commission of India
  • Easter & Holi echo in Nilgiris
  • Holiday Camp for children at JNMDA, Imphal
  • Zero waste is our moral responsibility
  • Elections & loyalty vis-a-vis Manipur crisis
  • Show of strength without unity
  • Yaoshang Pichakari #2 : Gallery
  • Panthoi Chanu : 1st to play in Australia
  • Intensive labs in film preservation
  • Building bridges with books
  • Need of the hour: Political maturity
  • Accepting defeat before the election
  • Descent of Radha-Krishna #28: Download
  • April Calendar for Year 2024 : Tools
  • Natural packaging from bamboo : Gallery
  • The Power of Poppy - 25 :: Poem
  • Everyone has their own Bharat Ratna
  • Nupi Landa Thaunaphabishing #12 :: Book
  • Demand- Manipuri as classical language
  • The Drummer from Odisha
  • Beauty benefits of lemon
  • Yaoshang Mei Thaba #2 : Gallery
  • Manipur's original Ponies : Gallery
  • Yaoshang & Dance of Democracy loom
  • Symposium on Jagadguru Shankaracharya
  • Choosing ITI as a campus after X
  • Yaoshang Pichakari #1 : Gallery
  • Yaoshang @Nabadwip Dham : Gallery
  • How oral health affects your pregnancy
  • Two faces of Holi
  • Prawaas 4.0, Multimodal Transport Show
  • A decade of development of higher education
  • Yaoshang Mei Thaba #1 : Gallery
  • Our Eternal Kangleipak :: Poem
  • Micro-livestock for livelihoods: For NE States
  • The fun of Holi used to be monotonous
  • 2nd Annual Art Exhibition #1 : Gallery
  • About the "Meitei" community from Manipur
  • Unveiling the medicinal benefits of honey
  • The incalculable value of wildlife
  • Promises of true love
  • Trends, Alliances, & Challenges in Elections
  • Meitei Goddess Ngaleima : An Artwork
  • Lamta Thangja @ Imphal : Gallery
  • Meira Paibis of Manipur
  • North East Film Festival #2 : Gallery
  • Students @ Class X Exam : Gallery
  • Saroi Khangba @ Kangla : Gallery
  • Protest for scrapping SoO #2 :Gallery
  • Shopping List for Shivaratri : Gallery
  • N Tombi Equestrian C'ships #1 : Gallery
  • Featured Front Page Photo 2024 #1: Gallery
  • Radio E-pao: Manipuri Film OST (130+ song)
  • Save Manipur : Protest [Feb 15] #3 : Gallery
  • Naorem Roshibina- Wushu Medallist : Gallery
  • GHOST of PEACE :: Download Booklet
  • List of Kings of Manipur: 33 - 1984 AD